In a situation where we cannot pour a concrete bench or concrete blocks and the ground in the place where the pavilion is to be located is not horizontal, we can make a steel frame leveling the ground in this way.
Below are some photos of how our last client in the Netherlands has prepared.
After placing the pavilion on the frame, we cover the frame and all visible non-aesthetic elements with special covers.
Soon there will be a short video from this construction.
After the well-known Eneco power plant in the Netherlands, another very popular HYDAC company trusted us and decided to order a pavilion for an office measuring 6m x 5m Pavilion built of two modules, in the future I will present some photos from unloading