The Eneco Power Plant from the Netherlands trusted us

Recently, we have built two pavilions for the Eneco power plant.
The first one is 12m x 6m and the second one is 5m x 2.75m
The location of the smaller pavilion was in a very difficult place, we had very little space to place the pavilion, photos below.

At a later time, he put a few photos from the unloading of a larger pavilion built of 4 modules.
I invite you to read.

Which type of cranes is best for unloading

In order to unload your newly purchased modular building, we will require a crane. There are generally two crane types which we recommend using. It’s either the HiAb crane or a static crane.

During the process of unloading, the building is lifted as a whole and set in the correct position. If the building is large, it will consists of more parts. Each part of the building is then lifted separately, placed next to one another and joined together by our crew.

Prior to the building assembly you will be sent some information, particularly regarding the weight of your modular building. This is in order to help you choose which type of crane is required. We will always advise further if needed.

As you can see at the photo above, during unloading, a crane is equipped with a hoist lifting belt and a spread beam. These are used together in order to lift and unload a modular building. Spread beam can be supplied by the crane company or by us in some cases. Spread beam we provide, can be used in order to lift the building depending on its weight. This beam can be used up to a maximum of 4000 kg load. If the maximum load is higher, the modular building must be unloaded with the use of a crane company’s spread beam.

Other than the need for a HiAb crane, sometimes, there may be need for a static crane use instead. Most often, static crane is required in places with difficult access. Static crane may also be needed if the building is particularly heavy or large. When it comes to the process of unloading, static crane, similar to a HiAb, is equipped with a hoist lifting belt and a spread beam in order to unload a modular building. The price of a static crane use is in fact higher in comparison to a HiAb. If situation requires it though, the use of a static crane may be unavoidable.

We hope that today we brought to you the process of unloading and assembling modular building a little bit closer.

Site preparation (concrete blocks)

 

Lastly, I briefly described the concrete foundation which in our opinion is the best solution, but it is also possible to prepare the substrate with concrete blocks

– concrete blocks

The main advantage of concrete blocks over a concrete foundation is that they are ready to be purchased and used in readiness. This means that you do not have to worry about the intense preparation and drying process. Our team will advise you that concrete blocks are sufficient to be used as a ground base under our building. Our architect assesses the size of the building and gives advice on the type of foundation needed. As part of the construction permit process, the local council will advise you if the current plot area is suitable for construction. The nature of our buildings is not permanent, but portable, which means that in most cases there is no need for additional tests on the ground.

Important information that you need to know about concrete blocks is how to arrange them. This will be developed by our architect during the design process and the customer will receive a special plan for the distribution of concrete blocks (as in the picture below)

Read more

Fast assembly of the 8×6 pavilion built of three modules

Fast assembly of the 8×6 pavilion built of three modules in Schweinnfurt, Germany
It took us only one day to assemble the pavilion measuring 8m x 6m. The modular building was built of three modules.
Standard equipment. In the previous post you can see the loading of this pavilion in our company in Efekt.
Below you can see the unloading and assembly of the portable building.
In the near future we are going to the Netherlands to build another very popular pavilon with dimensions of 6m x 5m
I encourage you to follow the posts.