One more solution of the ground for the pavilion

In a situation where we cannot pour a concrete bench or concrete blocks and the ground in the place where the pavilion is to be located is not horizontal, we can make a steel frame leveling the ground in this way.
Below are some photos of how our last client in the Netherlands has prepared.
After placing the pavilion on the frame, we cover the frame and all visible non-aesthetic elements with special covers.
Soon there will be a short video from this construction.

In the Netherlands, the next large European HYDAC company trusted the company EFEKT

After the well-known Eneco power plant in the Netherlands, another very popular HYDAC company trusted us and decided to order a pavilion for an office measuring 6m x 5m
Pavilion built of two modules, in the future I will present some photos from unloading

Modern designs of office pavilions

Sales of modern apartments, premises for offices or other activities usually take place in an equally modern environment. Also, office pavilions made of sandwich panels can be a place that catches the eye and where future buyers will feel good. The modern design of the office pavilion not only includes a space adapted to receive customers, but also the original facade, finishing and furnishing the interior of the pavilion. Modern designs of office pavilions include great opportunities for extending the facility with new modules and moving objects to new apartment sales locations. The facade of modern office pavilions is adapted to the appearance of neighboring buildings so that they form a coherent whole. Impressive office pavilions can take up a minimum of space, but also if necessary be modernized, and subsequent modules attached so that in comfortable conditions welcome those interested in buying an apartment.

Effect Pavilions in France

We had the pleasure of building a pavilion in a very sunny region of France in 83440 Montauroux
This is our first pavilion with dimensions of 7m x 5m

1 Aluminum glass door 1100mm x 2100mm 1 fixed window, 1200 mm x 2000 mm 1 fixed window 1300 mm x 2000 mm 3 windows opened 1000 mm x 2000 mm 1 window opened 800 mm x 1000 mm
In the future it will be used as an office.

Pavilion Efekt pictures in a standard version

Today I will present a few photos from the interior of the pavilion in a standard version.
I will remind quickly;
All pavilions Efekt built on steel construction, protected against corrosion.
The floor also on the steel structure from the outside we have a sheet, then the insulation from polystyrene and on top OSB board, the customer wishes we can put additional PVC panels.
Pictures of the completion of the pavilion with a floor with a PVC floor will be presented in the next post

Unloading and assembly of the Pavilion in the Netherlands

As before, I said this time unloading and assembly of the Modular building in the Netherlands
Below are some photos from the unloading of the 6×5 Pavilion.
A very popular building in the Netherlands because it is our third identical modular building in the Netherlands.
In the near future video clip and conversation with our client.

Which type of cranes is best for unloading

In order to unload your newly purchased modular building, we will require a crane. There are generally two crane types which we recommend using. It’s either the HiAb crane or a static crane.

During the process of unloading, the building is lifted as a whole and set in the correct position. If the building is large, it will consists of more parts. Each part of the building is then lifted separately, placed next to one another and joined together by our crew.

Prior to the building assembly you will be sent some information, particularly regarding the weight of your modular building. This is in order to help you choose which type of crane is required. We will always advise further if needed.

As you can see at the photo above, during unloading, a crane is equipped with a hoist lifting belt and a spread beam. These are used together in order to lift and unload a modular building. Spread beam can be supplied by the crane company or by us in some cases. Spread beam we provide, can be used in order to lift the building depending on its weight. This beam can be used up to a maximum of 4000 kg load. If the maximum load is higher, the modular building must be unloaded with the use of a crane company’s spread beam.

Other than the need for a HiAb crane, sometimes, there may be need for a static crane use instead. Most often, static crane is required in places with difficult access. Static crane may also be needed if the building is particularly heavy or large. When it comes to the process of unloading, static crane, similar to a HiAb, is equipped with a hoist lifting belt and a spread beam in order to unload a modular building. The price of a static crane use is in fact higher in comparison to a HiAb. If situation requires it though, the use of a static crane may be unavoidable.

We hope that today we brought to you the process of unloading and assembling modular building a little bit closer.